- This topic has 1 reply, 1 voice, and was last updated 2 months ago by .
Viewing 2 posts - 1 through 2 (of 2 total)
Viewing 2 posts - 1 through 2 (of 2 total)
- The topic ‘FABRIC PSC – Maintenance between Sept 8-14’ is closed to new replies.
Home › Forums › FABRIC Announcements › FABRIC PSC – Maintenance between Sept 8-14
Dear Experimenters,
There will be an extended maintenance on PSC node between September 8-14. Equipment will be relocated to a new facility. We will shut down the servers on September 8th at 9am ET. Reservations should be handled according to the outage period, please consider either deleting them before the maintenance or extending the reservations beyond September 14th to resume them after the maintenance.
Maintenance is completed. PSC node is online. VMs of the active slices are resumed.