1. Maintenance on UCSD on March 18th, 2026

Maintenance on UCSD on March 18th, 2026

Home Forums FABRIC Announcements Maintenance on UCSD on March 18th, 2026

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #9584
    Mert Cevik
    Moderator

      Dear Experimenters,

      We will perform a maintenance on UCSD node on March 18th, 2026 to integrate Nvidia BlueField-3 DPU.

      During this maintenance only the host/worker “ucsd-w3” will be powered down. Following slivers (VMs) will be offline and we will restart them after the maintenance. (Note that IP configurations of the dataplane interfaces may need to be re-configured by the users if they are not set to persist.)

      “sliver_id”: “1115bd73-3fe9-4270-aa19-a7927326cfb5”,
      “sliver_id”: “69ac10fb-52d1-4b80-9383-9a2abfc8b4a8”,
      “sliver_id”: “630af9b3-66fc-4b7f-b865-99b02f7f403d”,
      “sliver_id”: “c2ba7c4b-a46b-4e9b-bb3d-5ae8ba3de266”,
      “sliver_id”: “93532f6c-1ade-43eb-841c-309b7d1ec352”,
      “sliver_id”: “1efa7751-da18-41e9-ada9-5c320e9d161c”,
      “sliver_id”: “084d7d29-827b-4df8-95da-5f15b88c8ce3”,
      “sliver_id”: “58ee03bc-bfee-4d6f-b823-fbb8a98858c4”,
      “sliver_id”: “d0b94dd8-8d54-4574-8a1f-b15d1d4c5d65”,
      “sliver_id”: “1c9c499c-a144-4c71-ad8a-e5b0dd7cab83”,
      “sliver_id”: “e3e1bbae-1991-4c12-9649-1613afe28810”,
      “sliver_id”: “6ab86559-adf5-4a77-b21a-c1543fa44150”,
      “sliver_id”: “c42ac572-a126-40d5-8909-46e6f97f32cc”,
      “sliver_id”: “62cab003-9daa-4f37-9bdb-de8da442908a”,

      We will post status updates on this thread.

      #9599
      Mert Cevik
      Moderator

        This maintenance is completed.

      Viewing 2 posts - 1 through 2 (of 2 total)
      • You must be logged in to reply to this topic.