1. FABRIC MASS – Scheduled maintenance between June 2-4

FABRIC MASS – Scheduled maintenance between June 2-4

Home Forums FABRIC Announcements FABRIC MASS – Scheduled maintenance between June 2-4

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #8506
    Mert Cevik
    Moderator

      Dear Experimenters,

      There will be a power maintenance at the hosting datacenter and FABRIC-MASS will be offline between June 2-4, 2025.

      We will shut down the equipment at 10am EST on June 2 (Monday) and we will recover the slivers after the maintenance.
      Note that if the slice expiration dates fall within the maintenance window, we will not be able to recover the slivers, therefore users should consider extending the sliver expiration dates beyond June 4th, if recovery is desired.

       

    Viewing 1 post (of 1 total)
    • You must be logged in to reply to this topic.